OpenCores
URL https://opencores.org/ocsvn/openrisc_me/openrisc_me/trunk

Subversion Repositories openrisc_me

[/] [openrisc/] [trunk/] [gnu-src/] [gcc-4.5.1/] [gcc/] [testsuite/] [ada/] [acats/] [tests/] [c9/] [c951001.a] - Blame information for rev 294

Details | Compare with Previous | View Log

Line No. Rev Author Line
1 294 jeremybenn
-- C951001.A
2
--
3
--                             Grant of Unlimited Rights
4
--
5
--     Under contracts F33600-87-D-0337, F33600-84-D-0280, MDA903-79-C-0687,
6
--     F08630-91-C-0015, and DCA100-97-D-0025, the U.S. Government obtained
7
--     unlimited rights in the software and documentation contained herein.
8
--     Unlimited rights are defined in DFAR 252.227-7013(a)(19).  By making
9
--     this public release, the Government intends to confer upon all
10
--     recipients unlimited rights  equal to those held by the Government.
11
--     These rights include rights to use, duplicate, release or disclose the
12
--     released technical data and computer software in whole or in part, in
13
--     any manner and for any purpose whatsoever, and to have or permit others
14
--     to do so.
15
--
16
--                                    DISCLAIMER
17
--
18
--     ALL MATERIALS OR INFORMATION HEREIN RELEASED, MADE AVAILABLE OR
19
--     DISCLOSED ARE AS IS.  THE GOVERNMENT MAKES NO EXPRESS OR IMPLIED
20
--     WARRANTY AS TO ANY MATTER WHATSOEVER, INCLUDING THE CONDITIONS OF THE
21
--     SOFTWARE, DOCUMENTATION OR OTHER INFORMATION RELEASED, MADE AVAILABLE
22
--     OR DISCLOSED, OR THE OWNERSHIP, MERCHANTABILITY, OR FITNESS FOR A
23
--     PARTICULAR PURPOSE OF SAID MATERIAL.
24
--*
25
--
26
-- OBJECTIVE:
27
--      Check that two procedures in a protected object will not be
28
--      executed concurrently.
29
--
30
-- TEST DESCRIPTION:
31
--      A very simple example of two tasks calling two procedures in the same
32
--      protected object is used.  Test control code has been added to the
33
--      procedures such that, whichever gets called first executes a lengthy
34
--      calculation giving sufficient time (on a multiprocessor or a
35
--      time-slicing machine) for the other task to get control and call the
36
--      other procedure.  The control code verifies that entry to the second
37
--      routine is postponed until the first is complete.
38
--
39
--
40
-- CHANGE HISTORY:
41
--      06 Dec 94   SAIC    ACVC 2.0
42
--
43
--!
44
 
45
with Report;
46
with ImpDef;
47
 
48
procedure C951001 is
49
 
50
   protected Ramp_31 is
51
 
52
      procedure Add_Meter_Queue;
53
      procedure Subtract_Meter_Queue;
54
      function  TC_Failed return Boolean;
55
 
56
   private
57
 
58
      Ramp_Count : integer range 0..20 := 4;  -- Start test with some
59
                                              -- vehicles on the ramp
60
 
61
      TC_Add_Started       : Boolean := false;
62
      TC_Subtract_Started  : Boolean := false;
63
      TC_Add_Finished      : Boolean := false;
64
      TC_Subtract_Finished : Boolean := false;
65
      TC_Concurrent_Running: Boolean := false;
66
 
67
   end Ramp_31;
68
 
69
 
70
   protected body Ramp_31 is
71
 
72
      function TC_Failed return Boolean is
73
      begin
74
         -- this indicator will have been set true if any instance
75
         -- of concurrent running has been proved
76
         return TC_Concurrent_Running;
77
      end TC_Failed;
78
 
79
 
80
      procedure Add_Meter_Queue is
81
      begin
82
         --==================================================
83
         -- This section is all Test_Control code
84
         TC_Add_Started := true;
85
         if TC_Subtract_Started then
86
            if not TC_Subtract_Finished then
87
               TC_Concurrent_Running := true;
88
            end if;
89
         else
90
            -- Subtract has not started.
91
            -- Execute a lengthy routine to give it a chance to do so
92
            ImpDef.Exceed_Time_Slice;
93
 
94
            if TC_Subtract_Started then
95
               -- Subtract was able to start so we have concurrent
96
               -- running and the test has failed
97
               TC_Concurrent_Running := true;
98
            end if;
99
         end if;
100
         TC_Add_Finished := true;
101
         --==================================================
102
         Ramp_Count := Ramp_Count + 1;
103
      end Add_Meter_Queue;
104
 
105
      procedure Subtract_Meter_Queue is
106
      begin
107
         --==================================================
108
         -- This section is all Test_Control code
109
         TC_Subtract_Started := true;
110
         if TC_Add_Started then
111
            if not TC_Add_Finished then
112
               -- We already have concurrent running
113
               TC_Concurrent_Running := true;
114
            end if;
115
         else
116
            -- Add has not started.
117
            -- Execute a lengthy routine to give it a chance to do so
118
            ImpDef.Exceed_Time_Slice;
119
 
120
            if TC_Add_Started then
121
               -- Add was able to start so we have concurrent
122
               -- running and the test has failed
123
               TC_Concurrent_Running := true;
124
            end if;
125
         end if;
126
         TC_Subtract_Finished := true;
127
         --==================================================
128
         Ramp_Count := Ramp_Count - 1;
129
      end Subtract_Meter_Queue;
130
 
131
   end Ramp_31;
132
 
133
begin
134
 
135
   Report.Test ("C951001", "Check that two procedures in a protected" &
136
                           " object will not be executed concurrently");
137
 
138
   declare -- encapsulate the test
139
 
140
      task Vehicle_1;
141
      task Vehicle_2;
142
 
143
 
144
      -- Vehicle_1 and Vehicle_2 are simulations of Instances of the task
145
      -- of type Vehicle in different stages of execution
146
 
147
      task body Vehicle_1 is
148
      begin
149
         null;  -- ::::: stub.  preparation code
150
 
151
         -- Add to the count of vehicles on the queue
152
         Ramp_31.Add_Meter_Queue;
153
 
154
         null;  -- ::::: stub:  wait at the meter then pass to first sensor
155
 
156
         -- Reduce the count of vehicles on the queue
157
         null;  -- ::::: stub: Ramp_31.Subtract_Meter_Queue
158
      exception
159
         when others =>
160
               Report.Failed ("Unexpected Exception in Vehicle_1 task");
161
      end Vehicle_1;
162
 
163
 
164
      task body Vehicle_2 is
165
      begin
166
         null;  -- ::::: stub.  preparation code
167
 
168
         -- Add to the count of vehicles on the queue
169
         null;  -- ::::: stub Ramp_31.Add_Meter_Queue;
170
 
171
         null;  -- ::::: stub:  wait at the meter then pass to first sensor
172
 
173
         -- Reduce the count of vehicles on the queue
174
         Ramp_31.Subtract_Meter_Queue;
175
      exception
176
         when others =>
177
               Report.Failed ("Unexpected Exception in Vehicle_2 task");
178
      end Vehicle_2;
179
 
180
 
181
 
182
   begin
183
      null;
184
   end;   -- encapsulation
185
 
186
   if Ramp_31.TC_Failed then
187
      Report.Failed ("Concurrent Running detected");
188
   end if;
189
 
190
   Report.Result;
191
 
192
end C951001;

powered by: WebSVN 2.1.0

© copyright 1999-2024 OpenCores.org, equivalent to Oliscience, all rights reserved. OpenCores®, registered trademark.