1 |
294 |
jeremybenn |
-- C974012.A
|
2 |
|
|
--
|
3 |
|
|
-- Grant of Unlimited Rights
|
4 |
|
|
--
|
5 |
|
|
-- Under contracts F33600-87-D-0337, F33600-84-D-0280, MDA903-79-C-0687,
|
6 |
|
|
-- F08630-91-C-0015, and DCA100-97-D-0025, the U.S. Government obtained
|
7 |
|
|
-- unlimited rights in the software and documentation contained herein.
|
8 |
|
|
-- Unlimited rights are defined in DFAR 252.227-7013(a)(19). By making
|
9 |
|
|
-- this public release, the Government intends to confer upon all
|
10 |
|
|
-- recipients unlimited rights equal to those held by the Government.
|
11 |
|
|
-- These rights include rights to use, duplicate, release or disclose the
|
12 |
|
|
-- released technical data and computer software in whole or in part, in
|
13 |
|
|
-- any manner and for any purpose whatsoever, and to have or permit others
|
14 |
|
|
-- to do so.
|
15 |
|
|
--
|
16 |
|
|
-- DISCLAIMER
|
17 |
|
|
--
|
18 |
|
|
-- ALL MATERIALS OR INFORMATION HEREIN RELEASED, MADE AVAILABLE OR
|
19 |
|
|
-- DISCLOSED ARE AS IS. THE GOVERNMENT MAKES NO EXPRESS OR IMPLIED
|
20 |
|
|
-- WARRANTY AS TO ANY MATTER WHATSOEVER, INCLUDING THE CONDITIONS OF THE
|
21 |
|
|
-- SOFTWARE, DOCUMENTATION OR OTHER INFORMATION RELEASED, MADE AVAILABLE
|
22 |
|
|
-- OR DISCLOSED, OR THE OWNERSHIP, MERCHANTABILITY, OR FITNESS FOR A
|
23 |
|
|
-- PARTICULAR PURPOSE OF SAID MATERIAL.
|
24 |
|
|
--*
|
25 |
|
|
--
|
26 |
|
|
-- OBJECTIVE:
|
27 |
|
|
-- Check that the abortable part of an asynchronous select statement is
|
28 |
|
|
-- aborted if it does not complete before the triggering statement
|
29 |
|
|
-- completes, where the triggering statement is a call on a protected
|
30 |
|
|
-- entry which is queued.
|
31 |
|
|
--
|
32 |
|
|
-- TEST DESCRIPTION:
|
33 |
|
|
-- A fraction of in-line code is simulated. A voltage deficiency causes
|
34 |
|
|
-- the routine to seek an alternate best-cost route on an electrical grid
|
35 |
|
|
-- system.
|
36 |
|
|
--
|
37 |
|
|
-- An asynchronous select is used with the triggering alternative being a
|
38 |
|
|
-- call to a protected entry with a barrier. The abortable part is a
|
39 |
|
|
-- routine simulating the lengthy alternate path negotiation. The entry
|
40 |
|
|
-- barrier would be cleared if the voltage deficiency is rectified before
|
41 |
|
|
-- the alternate can be found thus nullifying the need for the alternate.
|
42 |
|
|
--
|
43 |
|
|
-- The test simulates a return to normal in the middle of the
|
44 |
|
|
-- negotiation. The barrier is cleared, the triggering alternative
|
45 |
|
|
-- completes first and the abortable part should be aborted.
|
46 |
|
|
--
|
47 |
|
|
--
|
48 |
|
|
-- CHANGE HISTORY:
|
49 |
|
|
-- 06 Dec 94 SAIC ACVC 2.0
|
50 |
|
|
--
|
51 |
|
|
--!
|
52 |
|
|
|
53 |
|
|
|
54 |
|
|
with Report;
|
55 |
|
|
with ImpDef;
|
56 |
|
|
|
57 |
|
|
procedure C974012 is
|
58 |
|
|
|
59 |
|
|
subtype Grid_Path is string(1..21);
|
60 |
|
|
subtype Deficiency is integer range 100..1_000; -- in MWh
|
61 |
|
|
|
62 |
|
|
New_Path : Grid_Path;
|
63 |
|
|
Dummy_Deficiency : Deficiency := 520;
|
64 |
|
|
Path_Available : Boolean := false;
|
65 |
|
|
|
66 |
|
|
TC_Terminate_Negotiation_Executed : Boolean := false;
|
67 |
|
|
TC_Trigger_Completed : Boolean := false;
|
68 |
|
|
TC_Negotiation_Completed : Boolean := false;
|
69 |
|
|
|
70 |
|
|
protected Local_Deficit is
|
71 |
|
|
procedure Set_Good_Voltage;
|
72 |
|
|
procedure Bad_Voltage;
|
73 |
|
|
entry Terminate_Negotiation;
|
74 |
|
|
private
|
75 |
|
|
Good_Voltage : Boolean := false; -- barrier
|
76 |
|
|
end Local_Deficit;
|
77 |
|
|
|
78 |
|
|
protected body Local_Deficit is
|
79 |
|
|
|
80 |
|
|
procedure Set_Good_Voltage is
|
81 |
|
|
begin
|
82 |
|
|
Good_Voltage := true;
|
83 |
|
|
end Set_Good_Voltage;
|
84 |
|
|
|
85 |
|
|
procedure Bad_Voltage is
|
86 |
|
|
begin
|
87 |
|
|
Good_Voltage := false;
|
88 |
|
|
end Bad_Voltage;
|
89 |
|
|
|
90 |
|
|
-- Trigger is queued on this entry with barrier condition
|
91 |
|
|
entry Terminate_Negotiation when Good_Voltage is
|
92 |
|
|
begin
|
93 |
|
|
-- complete the triggering call thus terminating grid_path
|
94 |
|
|
-- negotiation.
|
95 |
|
|
null; --::: stub - signal main board
|
96 |
|
|
TC_Terminate_Negotiation_Executed := true; -- show path traversal
|
97 |
|
|
end Terminate_Negotiation;
|
98 |
|
|
|
99 |
|
|
end Local_Deficit;
|
100 |
|
|
|
101 |
|
|
|
102 |
|
|
-- Routine to find the most cost effective grid path for this
|
103 |
|
|
-- particular deficiency at this particular time
|
104 |
|
|
--
|
105 |
|
|
procedure Path_Negotiation (Requirement : in Deficiency;
|
106 |
|
|
Best_Path : out Grid_Path ) is
|
107 |
|
|
|
108 |
|
|
Dummy_Path : Grid_Path := "NYC.425_NY.227_NH.132";
|
109 |
|
|
Match : Deficiency := Report.Ident_Int (Requirement);
|
110 |
|
|
|
111 |
|
|
begin
|
112 |
|
|
--
|
113 |
|
|
null; --::: stub
|
114 |
|
|
--
|
115 |
|
|
-- Simulate a lengthy path negotiation
|
116 |
|
|
for i in 1..5 loop
|
117 |
|
|
delay ImpDef.Minimum_Task_Switch;
|
118 |
|
|
-- Part of the way through the negotiation simulate some external
|
119 |
|
|
-- event returning the voltage to acceptable level
|
120 |
|
|
if i = 3 then
|
121 |
|
|
Local_Deficit.Set_Good_Voltage; -- clear the barrier
|
122 |
|
|
end if;
|
123 |
|
|
end loop;
|
124 |
|
|
|
125 |
|
|
Best_Path := Dummy_Path;
|
126 |
|
|
TC_Negotiation_Completed := true;
|
127 |
|
|
|
128 |
|
|
end Path_Negotiation;
|
129 |
|
|
|
130 |
|
|
|
131 |
|
|
|
132 |
|
|
begin
|
133 |
|
|
|
134 |
|
|
Report.Test ("C974012", "Asynchronous Select: Trigger is queued on a " &
|
135 |
|
|
"protected entry and completes before the " &
|
136 |
|
|
"abortable part");
|
137 |
|
|
|
138 |
|
|
-- ::::::::: Fragment of code
|
139 |
|
|
|
140 |
|
|
Local_Deficit.Bad_Voltage; -- Set barrier condition
|
141 |
|
|
|
142 |
|
|
-- For the given voltage deficiency start negotiating the best grid
|
143 |
|
|
-- path. If voltage returns to acceptable level cancel the negotiation
|
144 |
|
|
--
|
145 |
|
|
select
|
146 |
|
|
-- Prepare to terminate the Path_Negotiation if voltage improves
|
147 |
|
|
Local_Deficit.Terminate_Negotiation;
|
148 |
|
|
TC_Trigger_Completed := true;
|
149 |
|
|
then abort
|
150 |
|
|
Path_Negotiation (Dummy_Deficiency, New_Path) ;
|
151 |
|
|
Path_Available := true;
|
152 |
|
|
end select;
|
153 |
|
|
-- :::::::::
|
154 |
|
|
|
155 |
|
|
if not TC_Terminate_Negotiation_Executed or else not
|
156 |
|
|
TC_Trigger_Completed then
|
157 |
|
|
Report.Failed ("Unexpected test path taken");
|
158 |
|
|
end if;
|
159 |
|
|
|
160 |
|
|
if Path_Available or else TC_Negotiation_Completed then
|
161 |
|
|
Report.Failed ("Abortable part was not aborted");
|
162 |
|
|
end if;
|
163 |
|
|
Report.Result;
|
164 |
|
|
|
165 |
|
|
end C974012;
|