Rev |
Log message |
Author |
Age |
Path |
255 |
Documento Final con primeros resultados de desempeño |
jguarin2002 |
4314d 18h |
/raytrac/branches/fp/doc/ |
254 |
... |
jguarin2002 |
4317d 13h |
/raytrac/branches/fp/doc/ |
253 |
.... |
jguarin2002 |
4317d 13h |
/raytrac/branches/fp/doc/ |
252 |
Performance Results on the Raytrac |
jguarin2002 |
4318d 17h |
/raytrac/branches/fp/doc/ |
251 |
Es claro.... |
jguarin2002 |
4318d 17h |
/raytrac/branches/fp/doc/ |
250 |
Design changed..... doubts about OS using |
jguarin2002 |
4318d 17h |
/raytrac/branches/fp/doc/ |
247 |
Advance in application... but some normalization problems had popped up |
jguarin2002 |
4330d 05h |
/raytrac/branches/fp/doc/ |
245 |
Avances pequenos en los documentos |
jguarin2002 |
4349d 12h |
/raytrac/branches/fp/doc/ |
231 |
nfetch address counter implemented in a whole register for convinience |
jguarin2002 |
4354d 17h |
/raytrac/branches/fp/doc/ |
226 |
Documento 90%, falta el glosario de siglas, el anexo de referencia de RTLs, el capitulo 9 (trazador de rayos) y la bibiliografia |
jguarin2002 |
4362d 17h |
/raytrac/branches/fp/doc/ |
225 |
Documento 90%, falta el glosario de siglas, el anexo de referencia de RTLs, el capitulo 9 (trazador de rayos) y la bibiliografia |
jguarin2002 |
4362d 18h |
/raytrac/branches/fp/doc/ |
224 |
Documento 90%, falta el glosario de siglas, el anexo de referencia de RTLs, el capitulo 9 (trazador de rayos) y la bibiliografia |
jguarin2002 |
4362d 18h |
/raytrac/branches/fp/doc/ |
223 |
Reportes para NS_JULI_SDF_ASM_AP_DMA_130812_21028 |
jguarin2002 |
4369d 17h |
/raytrac/branches/fp/doc/ |
222 |
documento en un 55\% |
jguarin2002 |
4369d 17h |
/raytrac/branches/fp/doc/ |
210 |
Document advance..... towards dma oriented raytrac |
jguarin2002 |
4384d 13h |
/raytrac/branches/fp/doc/ |
199 |
Check out in the design document for changes made on Load logic, a load chain has been added to Memblock I/O and several memory blocks were removed, under construction, this version WONT in any means work |
jguarin2002 |
4400d 19h |
/raytrac/branches/fp/doc/ |
197 |
Chnages on interconnectivity: Check out the SGDMA Sheets |
jguarin2002 |
4410d 21h |
/raytrac/branches/fp/doc/ |
196 |
raytrac+sg_dma+raytrac. Step One, the DPC is transformed. Now there are five instructions (check the design document), theres no full queue sync event, there are only four result queues and only 3 add fp 32 b adders rather than 4. Even it seems like a reduction has taken place, decodification efforts take place when decoding multiplexation from arithmetic blocks towards the resulting queues |
jguarin2002 |
4414d 08h |
/raytrac/branches/fp/doc/ |
195 |
Document advance and changes in the design |
jguarin2002 |
4417d 05h |
/raytrac/branches/fp/doc/ |
194 |
Work In Progress |
jguarin2002 |
4432d 10h |
/raytrac/branches/fp/doc/ |